LIFE FEATURES
|
|
|
LIFE is a DOS based multiphase life cycle cost analysis program. It can determine the lowest cost amongst complex project alternatives using the net present value method. LIFE is a very general economic analysis program in that both energy and non-energy related projects can be analyzed. LIFE allows for initial, operational, maintenance, recurring non-annual, and special one time costs. In LIFE, projects can have a life span of up to 50 years. LIFE can also handle projects with multiple phases. Phasing is especially useful for analyzing projects that have planned major additions over the life of the project. PROGRAM INPUT LIFE uses full screen editing features that provide a simple "fill in the blank" input procedure. All input data is checked at the time of entry so that no improper data can be entered. If you have a question about what the program is requesting, type a "?" and the program will offer additional explanations about the input data being requested. Upon completion of the input process, all data is saved to disk and can be reviewed and edited whenever desired. Two types of data are requested: general project data and detailed cost data. The general project data includes the project name, client name, designer name, life cycle base year, interest rates, and phase description data. The detailed cost data allows five cost types per phase: initial costs, operational costs, maintenance costs, cyclical costs, and one time costs PROGRAM OUTPUT The LIFE program provides two basic types of reports: reflection of the input data and computed life cycle costs. The life cycle costs can be printed in summary or detailed form. Many of the reports list the life cycle costs in tabular form such that the total life cycle cost can be easily verified. Reports can be printed to screen, printer or disk file SYSTEM REQUIREMENTS Elite's DOS software application LIFE is compatible with all Windows Operating
Systems.(Windows 95, 98, ME, NT 4.0, 2000, and XP) The minimum hardware requirements to run our application are the same as the minimum hardware requirements to run the operating system which the application is installed
on click here for details. Additionally, 1 MB of hard disk space is required to install and run
LIFE.
LIFE CYCLE COST ANALYSIS (DATA ENTRY SYSTEM BY ELITE SOFTWARE) PAGE 5
BODINE ELECTRIC DECATUR, IL 62526
EZ-LCCID 1.051 DATE: 01-11-91 TIME: 15:16:10 STUDY: TEST1
PROJECT NO., FY, & TITLE: PN 776 - FY 1990 ADMINISTRATION BUILDING
INSTALLATION & LOCATION: FT. LEONARD, WOOD MISSOURI
DESIGN FEATURE: BUILDING ENVELOPE
ALT. ID. TITLE: PRESCRIPTIVE BUILDING
NAME OF DESIGNER: JOE DESIGNER
BENEFICIAL OCCUPANCY DATE: JUL93
ACTUAL ANNUAL PAYMENTS OCCUR: JUL94 THROUGH JUL18
ANNUAL PAYMENTS FOR ANALYSIS OCCUR: JUL91 THROUGH JUL15
YEAR-BY-YEAR BREAKDOWN OF LIFE CYCLE COSTS*
===================================================
| PAY| ELECT | NAT G | M & R | R / R | OTHER |
|====|========|========|========|========|========|
| 1 | 8656.| 1062.| 93458.| 0.| 0.|
| 2 | 8234.| 1004.| 87344.| 0.| 0.|
| 3 | 7495.| 955.| 81630.| 0.| 0.|
| 4 | 7021.| 913.| 76290.| 0.| 0.|
| 5 | 6626.| 876.| 71299.| 0.| 0.|
| 6 | 6118.| 859.| 66634.| 0.| -7130.|
| 7 | 5611.| 824.| 62275.| 0.| 0.|
| 8 | 5301.| 804.| 58201.| 0.| 0.|
| 9 | 5030.| 795.| 54393.| 0.| 0.|
| 10 | 4755.| 774.| 50835.| 0.| 0.|
| 11 | 4444.| 723.| 47509.| 0.| 0.|
| 12 | 4153.| 676.| 44401.| 0.| 4751.|
| 13 | 3937.| 656.| 41496.| 0.| 0.|
| 14 | 3719.| 636.| 38782.| 0.| 0.|
| 15 | 3525.| 622.| 36245.| 0.| 0.|
| 16 | 3338.| 607.| 33873.| 54367.| 0.|
| 17 | 3139.| 586.| 31657.| 0.| 0.|
| 18 | 2947.| 560.| 29586.| 0.| 3166.|
| 19 | 2771.| 546.| 27651.| 0.| 0.|
| 20 | 2605.| 534.| 25842.| 0.| 0.|
| 21 | 2432.| 517.| 24151.| 0.| 0.|
| 22 | 2289.| 497.| 22571.| 0.| 0.|
| 23 | 2141.| 472.| 21095.| 0.| 0.|
| 24 | 2002.| 446.| 19715.| 0.| 2109.|
| 25 | 1873.| 423.| 18425.| 0.| 0.|
|====|========|========|========|========|========|
| ** | 110161.| 17369.|1165358.| 54367.| 2896.|
* NET PW EQUIVALENTS ON JULY 90 IN CONSTANT JULY 90 DOLLARS
* ENERGY ESCALATION VALUES FROM TABLES OF JAN 90
EZLCCID SAMPLE REPORT 2
LIFE CYCLE COST ANALYSIS (DATA ENTRY SYSTEM BY ELITE SOFTWARE) PAGE 6
BODINE ELECTRIC DECATUR, IL 62526
EZ-LCCID 1.051 DATE: 01-11-91 TIME: 15:16:10 STUDY: TEST1
PROJECT NO., FY, & TITLE: PN 776 - FY 1990 ADMINISTRATION BUILDING
INSTALLATION & LOCATION: FT. LEONARD, WOOD MISSOURI
DESIGN FEATURE: BUILDING ENVELOPE
ALT. ID. TITLE: PRESCRIPTIVE BUILDING
NAME OF DESIGNER: JOE DESIGNER
* LIFE CYCLE COST TOTALS *
INITIAL INVESTMENT COSTS 900,000.
SPECIAL PRE-BOD COSTS / BENEFITS 10,000.
ENERGY COSTS:
ELECTRICITY 110,161.
NATURAL GAS 17,369.
TOTAL ENERGY COSTS 127,530.
RECURRING M&R/CUSTODIAL COSTS 1,165,358.
MAJOR REPAIR/REPLACEMENT COSTS 54,367.
OTHER O&M COSTS & MONETARY BENEFITS 2,896.
DISPOSAL COSTS/RETENTION VALUE 1,842.
LCC OF ALL COSTS/BENEFITS (NET PW) 2,261,994.
* NET PW EQUIVALENTS ON JULY 90 IN CONSTANT JULY 90 DOLLARS
* ENERGY ESCALATION VALUES FROM TABLES OF JAN 90
LIFE SAMPLE REPORT 3
******* LIFE CYCLE COST PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC. *******
YOUR COMPANY NAME YOUR CITY, STATE
Building Addition January 11, 1991 PAGE 4
*********************** L.C.C. RESULTS FOR PHASE 1 ***********************
PHASE 1 LIFE CYCLE RESULTS:
REF ACT. INITIAL OPERATION MAINT. CYCLICAL ONE TIME TOTAL
YEAR YEAR COST COST COST COST COST COSTS
1 1991 0 0 0 0 0 0
2 1992 113,556 0 0 0 0 113,556
3 1993 1,077 22,632 5,044 0 0 28,753
4 1994 953 21,291 4,902 0 0 27,146
5 1995 843 20,032 4,763 0 0 25,638
6 1996 746 18,847 4,629 0 0 24,223
7 1997 660 17,734 4,499 0 364 23,257
8 1998 0 16,687 4,373 0 0 21,059
9 1999 0 15,702 4,250 0 0 19,952
10 2000 0 14,777 4,132 0 0 18,908
11 2001 0 13,906 4,016 0 0 17,922
12 2002 0 13,088 3,904 0 10,499 27,491
13 2003 0 12,318 3,796 0 0 16,114
14 2004 0 11,594 3,690 0 0 15,285
15 2005 0 10,914 3,588 0 0 14,502
16 2006 0 10,274 3,489 0 0 13,762
17 2007 0 9,672 3,392 0 244 13,308
18 2008 0 9,105 3,299 0 0 12,404
19 2009 0 8,572 3,208 0 0 11,780
20 2010 0 8,071 3,119 0 0 11,191
21 2011 0 7,600 3,034 0 0 10,634
22 2012 0 7,157 2,950 0 0 10,107
23 2013 0 0 0 0 0 0
24 2014 0 0 0 0 0 0
25 2015 0 0 0 0 0 0
26 2016 0 0 0 0 0 0
27 2017 0 0 0 0 0 0
28 2018 0 0 0 0 0 0
29 2019 0 0 0 0 0 0
30 2020 0 0 0 0 0 0
31 2021 0 0 0 0 0 0
32 2022 0 0 0 0 0 0
33 2023 0 0 0 0 0 0
34 2024 0 0 0 0 0 0
35 2025 0 0 0 0 0 0
36 2026 0 0 0 0 0 0
37 2027 0 0 0 0 0 0
38 2028 0 0 0 0 0 0
39 2029 0 0 0 0 0 0
40 2030 0 0 0 0 0 0
-------- -------- -------- -------- --------- --------
TOTALS $117,836 $269,972 $78,078 $0 $11,107 $476,993LIFE SAMPLE REPORT 4
******** LIFE CYCLE COST PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC. ******
YOUR COMPANY NAME YOUR CITY, STATE
Building Addition January 11, 1991 PAGE 5
*********************** PROJECT LIFE CYCLE SUMMARY ***********************
REF ACT. PHASE 1 PHASE 2 PHASE 3 PHASE 4 TOTAL
YEAR YEAR LCC ($) LCC ($) LCC ($) LCC ($) LCC($)
1 1991 0 0 0 0 0
2 1992 113,556 0 0 0 113,556
3 1993 28,753 0 0 0 28,753
4 1994 27,146 0 0 0 27,146
5 1995 25,638 0 0 0 25,638
6 1996 24,223 0 0 0 24,223
7 1997 23,257 0 0 0 23,257
8 1998 21,059 0 0 0 21,059
9 1999 19,952 0 0 0 19,952
10 2000 18,908 0 0 0 18,908
11 2001 17,922 0 0 0 17,922
12 2002 27,491 27,084 0 0 54,575
13 2003 16,114 21,482 0 0 37,596
14 2004 15,285 20,658 0 0 35,943
15 2005 14,502 19,867 0 0 34,369
16 2006 13,762 19,107 0 0 32,869
17 2007 13,308 18,673 0 0 31,982
18 2008 12,404 17,675 0 0 30,079
19 2009 11,780 17,000 0 0 28,781
20 2010 11,191 16,353 0 0 27,543
21 2011 10,634 15,730 0 0 26,364
22 2012 10,107 15,132 0 0 25,239
23 2013 0 14,557 0 0 14,557
24 2014 0 14,004 0 0 14,004
25 2015 0 13,473 0 0 13,473
26 2016 0 12,963 0 0 12,963
27 2017 0 22,905 0 0 22,905
28 2018 0 12,001 0 0 12,001
29 2019 0 11,548 0 0 11,548
30 2020 0 11,113 0 0 11,113
31 2021 0 10,694 0 0 10,694
32 2022 0 10,292 0 0 10,292
33 2023 0 0 0 0 0
34 2024 0 0 0 0 0
35 2025 0 0 0 0 0
36 2026 0 0 0 0 0
37 2027 0 0 0 0 0
38 2028 0 0 0 0 0
39 2029 0 0 0 0 0
40 2030 0 0 0 0 0
-------- -------- ------- -------- --------
TOTALS $476,993 $342,311 $0 $0 $819,305
|